Design & Engineering

IDC provides turn-key solutions in the field of Highways Design using Modern Technology Remote Sensing, extensive Computer Application for Survey, Planning, Design & Engineering. We have worked closely with National Highways Authority of India (NHAI) and Ministry of Road, Transport & Highways (MoRT&H) among many other clients.

Highlights-

Consultancy Services for Feasibility Study and preparation of Detailed Project Report for improvement and up-gradation of National Highway No. 731B starting from the junction with NH 31 near Machhlisahar connecting Janghai, Durgaganj, Bhadohi, Kapsethi and terminating at its junction with LahartaraMohansarai Road (ODR) near Varanasi in the State of Uttar Pradesh. Project includes Road Safety Audit. Package – I: 49.200 Km. (2-lane)  NH-731- Package – II: 40.085 Km. (4-lane)  NH-731-B Total Length – 89.285 Km.  Total Project Cost: 1579.61 Cr.

Client : Superintending Engineer, NH Div Prayagraj/ MoRTH

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report Improvements/Widening to two lane with paved shoulders of NH-548B from Km 0.00 (Maharashtra border Murrum) to Km.106.00 (Bijapur junction terminating at IB Circle Junction). Length of Project Road : 106 km (2-Lane)

Client : Executive Engineer, NH Div Vijajapura, Karnataka / MoRTH

Consultancy Services for Preparation of  Feasibility/DPR for widening to two lane with paved shoulder on NH 766C from Km 0.00 to 38.70 (Byndoor to Nittur) in the State of Karnataka (Total Length  38.70  Km) on NH-766 C    in the states of Karnataka. Length- 38.70 Km

Client : Executive Engineer, NH Div Shimoga, Karnataka / MoRTH

Consultancy Services for Preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches of National Highways in the State of Uttar Pradesh. Construction of Chitrakoot / Karvi bypass on NH-76 (15km); Reconstruction of Mandakini river bridge at Km. 281 on NH-76 Length–15. Package No.: RO/LKO/DPR/Package-II. Length- 15 Km.  

Client : Superintending Engineer, NH Div, Kanpur Uttar Pradesh / MoRTH

Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh Kiraoli Mori Vamanpura Jhengera Kagarol section of NH-321 (Package No: CE-RO/LKO/DPR/Lot-I1/Package-III Length- 15.25 Km

Client: Chief Engineer Regional Office, Lucknow, Ministry of Road Transport & Highways, Government of India

Consultancy services for Feasibility study and detailed project report of 4 laning from Naubatpur to Hariharganj of existing Anisabad Patna Arwal Aurangabad Hariharganj Section of NH139 in Bihar. Length – 132 Km. ( 4-Lane) 

Client: Executive Engineer, NH Division Aurangabad/Ministry of Road Transport & Highways, Government of India

Technical Consultant for Preparation of Feasibility Study and Detailed Project Report (DPR) for Construction of Part-I Mipi-Andrathang – 30 Km. and Part-II Changloham-Kepau 6.375 Km. in the State of Arunachal Pradesh. Length – 36.375 Km. 

Client: Border Road Organization (BRO), Project Udayak

Consultancy Services for Preparation of Detailed Project Report of Two Lane with Paved Shoulders/Four Laning of Newly Declared National Highways NH-458 B from NH-3 Shahpur to NH-4 Khapoli in Maharashtra, Length of Project Road : 91.631 km (2-Lane)

Client: Maharashtra State Road Development Corporation, Mumbai, Maharashtra

Preparation of Detailed Design and Engineering Report for Six Lane Bus Rapid Transit System (BRTS) in Delhi in the Country of India Length of Project Road : 55.10 km(Six Lane ) Length Equivalent to 4-Lane: 88.725 Km.  as per MoRTH, India

Client: Delhi Integrated Multi-Modal Transit System Limited, India

Preparation of Detailed Feasibility Report for 2-lane Improvement and Upgradation of SHs and MDRs in Bhopal Division (2 SHs and 14 MDRs), Total Package Length: 584.46 kms. Length of State Highways:  584.46 Km Length Equivalent to 4-Lane: 233.784 Km.  as per MoRTH, India Hilly Terrain Highway  Section: Shahganj-Barkheda Length: 18.70 Km.

Client:MP Road Development Corporation, India

Preparation of Detailed Feasibility Report for 2-lane Improvement and Upgradation of SHs and MDRs in Sagar Division (3 SHs and 5 MDRs), total length 320.50 kms. Length of State Highways:  320.50 Km Length Equivalent to 4-Lane: 128.20 Km.  as per MoRTH, India

Client:MP Road Development Corporation, India

Preparation of Detailed Project Report, Financial Analysis and Detailed Traffic Surveys for 2 lane  Road Projects (Package-II)., Total Length of Package : 265km Length of State Highways: 265 Kms Length Equivalent to 4-Lane: 106 Km.  as per MoRTH, India

Client:MP Road Development Corporation, India

Asian Development Bank (ADB) funded Preparation of Detailed Project Report for 2-lanning of Major District Roads under ADB, Package-V: Sagar in Madhya Length of Project Road : 161.120km Length Equivalent to 4-Lane: 64.44 Km. as per MoRTH, India

Client:MP Road Development Corporation, India

Consultancy Services for Preparation of Feasibility and Detailed Project Report using LiDAR Technology for Two Lane with Paved Shoulders State Highways under Maharashtra Road Improvement program in Aurangabad Region (Package AU-63, Osmanabad), Total Project Length : 141.70km Length Equivalent to 4-Lane: 56.68 Km. as per MoRTH, India

Client:Executive Engineer, MHPWD, Osmanabad Division, India

Consultancy Services for Preparation of Feasibility and Detailed Project Report using LiDAR Technology for Two Lane with Paved Shoulders under Maharashtra Road Improvement program in Nashik Region (Package NSK 52, Ahmednaagar), km, Total Project Length : 103.639 km Length Equivalent to 4-Lane: 41.45 Km. as per MoRTH, India

Client:Executive Engineer, MHPWD, Ahmednagar Division, India

Consultancy Services for Preparation of Feasibility and Detailed Project Report using LiDAR Technology for Two Lane with Paved Shoulders State Highways under Maharashtra Road Improvement program in Nashik Region (Package NSK-45, Shahada) Total Project Length-96.05 Km (2-Lane) Length of HillyTerrain Highway  Sections: 29.40 Km

Client:Executive Engineer, MHPWD, Shahada Division, India

Consultancy Services for Preparation of Feasibility and Detailed Project Report using LiDAR Technology for Two Lane with Paved Shoulders under Maharashtra Road Improvement program in Nashik Region (Package NSK 49, Jalgaon) Total Project Length-94.82 Km  (2-Lane)

Client: Executive Engineer, MHPWD, Jalgaon Division, India 

Consultancy Services for Preparation of Feasibility and Detailed Project Report using LiDAR Technology for Two Lane with Paved Shoulders of State Highways under Maharashtra Road Improvement program in Nashik Region (Package NSK 47, Amaner), Length of Project: 83.150km (2-Lane)

Client:Executive Engineer, MHPWD, Amalner Division, India

Consultancy Services for Preparation of Feasibility and Detailed Project Report using LiDAR Technology for Two Lane with Paved Shoulders State Highways under Maharashtra Road Improvement program in Nashik Region (Package NSK-57, Nashik) Total Project Length-48.50 Km (2-Lane)

Client:Executive Engineer (East), MHPWD, Nashik Division, India

Consultancy Services for Preparation of Feasibility Study Report cum Preliminary Design Report for State Highway for two – laning of Bambora (Kishangarh Bas) to Naugaon (the  “Highway”) Length of Project Road : 30.00 km (2-Lane)

Client:The Additional Chief Engineer (PPP), PWD, Rajasthan

“Consultancy Services for Preparation of Feasibility Study report cum preliminary design report for Two – Laning of  Dudu – Sambhar – Bhatipura (SH-2) (the “Highway”) Length of Project Road : 40.00 km (2-Lane)

Client:The Additional Chief Engineer (PPP), PWD, Rajasthan

Consultancy Services for Preparation and finalization of Detailed Project Report for the projects under Hybrid Annuity Model Program Phase-II. NIT No.- 03 for 2023-2024 (Pkg. NAG-II (58), Project Length – 120.70 Km. (SH)

Client: Maharashtra PWD

Consultancy Services for Preparation and finalization of Detailed Project Report for the projects under Hybrid Annuity Model Program Phase-II. NIT No.- 03 for 2023-2024 (Pkg. NAG-II (61)), Project Length – 121.50 Km. (SH)

Client: Maharashtra PWD

Consultancy Services for Preparation and finalization of Detailed Project Report for the projects under Hybrid Annuity Model Program Phase-II. NIT No.- 03 for 2023-2024 (Pkg. NAG-II (62)), Project Length – 78.00 Km. (SH)

Client: Maharashtra PWD

A vision backed with invaluable experience and years of commitment towards the betterment of society manifested itself in the genesis of a humble beginning called “Infrastructure Development Consultants (IDC)”.

Near Chunna Bhatti Thana Bhopal Pin- 462016
(Sat - Thursday)
(10am - 05 pm)
X